Grupo Pitti engineer reviewing plans in front of a completed coastal property

Completed retention and coastal defense projects

Ground retention and coastal defense cases completed in Panama and Costa Rica, with the method, the material and the result of each project.

✦ ✦

Project portfolio

Project case studies

Here are some of the projects where we’ve applied our experience in coastal defenses, retaining systems and civil construction, across different countries in the region.

03 featured projects

01
Completed synthetic sheet pile wall at the Brostella Novey property Panama
100% Land reclaimed

Coastal defenses · Panama

Brostella Novey Project

The original concrete wall collapsed under heavy wave action. We built a wall of synthetic sheet piles that reclaimed the lost ground and protects the property for the long term.

Location Panama
Type of work Sheet pile wall
Status Completed
Method Sheet pile driving
Material PVC/HDPE synthetic sheet pile
02
Stabilized coastal area at PH Condominio Punta Chame Punta Chame, Panama
100% Completed coastal defenses

Coastal protection · Panama

PH Condominio Punta Chame

Erosion and wave action were putting nearby infrastructure at risk. We installed retaining structures and applied controlled fill to stabilize the shoreline and reclaim the land. If your property faces a similar risk, you can contact us to have it assessed.

Location Punta Chame, Panama
Type of work Retention and fill
Status Completed
Method Retention + controlled fill
Material Riprap rock and geotextile
03
Completed steel sheet pile retaining system in Jaco, Costa Rica Jaco, Costa Rica
2023 Year completed

Retaining systems · Costa Rica

Excavation retention in Jaco

We implemented a steel sheet pile retaining system that ensures safety and stability during excavation, preventing collapse risks during construction.

Location Jaco, Costa Rica
Description Steel sheet piles
Status Completed
Method Steel sheet pile driving
Material Galvanized steel profile

River Mitigation and Urban Renewal Works – Limon, Costa Rica

A river stabilization project carried out in the province of Limon, Costa Rica, where the river’s constant rise was threatening homes, access roads and the safety of riverside communities.

Phase 01 — Goban 2
01
Riverbank defense · Panama

Initial condition and risk assessment

Identification of critical zones vulnerable to river erosion and scouring. Safety perimeters are established to protect adjacent infrastructure —homes and roads— at imminent risk from the instability of the natural slope.

⚠️ Risk
High structural
🚧 Action
Safety perimeter
📋 Analysis
Topographic and hydrological
⚠️ Critical zone Vulnerable to scouring
Risk assessment on the river slope before intervention Phase 01 / 05
Phase 02 — Goban 2
🚜 Earthworks Riverbank grading
⛏️ Active clearing
Riverbed excavation and preparation with heavy machinery Phase 02 / 05
02
Riverbank defense · Panama

Riverbed excavation and preparation

Direct intervention with heavy machinery to clear the riverbank. Unstable material, sediment and collapsed barriers —such as old timber piling systems— are removed. The ground is graded and excavated to the foundation level needed for the new structural defenses, without disrupting the river’s natural flow.

🚜 Movement
Bank grading
⛏️ Clearing
Structure removal
📐 Preparation
Foundation level
Phase 03 — Goban 2
03
Riverbank defense · Panama

Metal retaining system driving

Installation of the main retaining wall by driving interlocking steel sheet piles. Using long-reach excavators fitted with vibratory hammers, the metal profiles are driven deep into the riverbed. This continuous system creates a watertight barrier that is highly resistant to the push of water and earth, permanently stabilizing the slope.

🏗️ Driving
Vibratory installation
🛡️ Sheet piling
Interlocked steel barrier
📏 Alignment
Deep stabilization
🏗️ Vibratory driving High-precision installation
🛡️ Active sheet piling
Steel sheet pile driving to retain the river slope Phase 03 / 05
Phase 04 — Goban 2
⚡ Structural consolidation Cap welding
🚶‍♂️ Active accessibility
Finishing welds and urban integration on the riverbank defense Phase 04 / 05
04
Riverbank defense · Panama

Finishing welds and urban integration

Consolidation of the retaining structure and adaptation of the surrounding civil environment. Metal cap profiles (a capping beam) are installed and welded to tie the sheet piles together and distribute loads. At the same time, the project is integrated into the urban surroundings through the construction of sidewalks with tactile paving and the installation of pedestrian bridges, restoring safe connectivity to the community.

⚡ Consolidation
Cap welding
🚶‍♂️ Accessibility
Tactile paving sidewalks
🌉 Connectivity
Pedestrian bridges
Phase 05 — Goban 2
05
Riverbank defense · Panama

Testing and active resilience

The retaining system has already withstood high-flow events without overflowing. The channel carries stormwater and river water while keeping the roadway and adjacent residential areas protected.

🌊 Control
Flood channeling
🌧️ Resilience
Operation in extreme weather
🛡️ Protection
Infrastructure safeguarded
🌊 Flood control Channel operating successfully
🛡️ Zone protected
Riverbank defense in operation during a high-flow event Phase 05 / 05

Is your property at risk from the sea?

Tell us about your land and we’ll help you find the right solution.

Request a quote